2015年10月21日星期三

Professional autoclave mushroom growing sterilizing machine with reliable performance

1. Installation
The installment of the autoclave sterilizing equipment is very important,please reading this chapter carefully,users should better install the equipment under the guide of the installation and debugging personnel.
sterilizing equipment
2. Positioning & installing
According to the mushroom growing sterilizing machine installation drawing, positioning at site, and then transport the equipment to the four positioning points, positioning with the corresponding equipment. Fix the back door chassis and the pit embedded parts with welding, prevent the cylinder extension by heating,ensure sealing and isolation of the back door.
sterilizing machine
3. Levelling
After positioning the autoclave mushroom growing sterilizing machine,levelling the inner chamber with gradienter after open the door in hand.If the equipment inner chamber level have error, you can stack up the iron plate under the equipment supporting point according to the needs.(The thickness of the iron plate is determined by the level error magnitude).
autoclave sterilizer machine
Please directly contact me if there is any question: Phone/whatsapp: +8615738809371 Skype:mushroom.equipment E-mail:vip@satrise.com

没有评论:

发表评论